0 results for iapcv for 3126 cat Save iapcv for 3126 cat to get e-mail alerts and updates on your eBay Feed. Unfollow iapcv for 3126 cat to stop getting updates on your eBay Feed. Home » Fuel System Caterpillar Engine » Fuel System C7 and C9 - Caterpillar Electronic Engine » Fuel System Caterpillar Engine » Fuel System C7 and C9 - Caterpillar. C7 - C32 Marine Engine Electronics Application and Installation Guide Caterpillar: Confidential Yellow 5 1 Introduction and Purpose This document is intended to provide the necessary information for correct installation of the following Caterpillar engines into marine engine applications: C7/C9, C12, C18, and C32. Download File PDF Cat C7 Engine Sensor Location Cat C7 Engine Sensor Location Cat C7 Engine Sensor Location C7 Engines Illustration 2 g01114317 Typical view of the left side of the C7 engine (1) Fuel pressure sensor (if equipped) (2) J500/P500 Injection actuation pressure control valve connector (3) Injection actuation pressure sensor (4.


3126 (1WM Truck Engines)

Introduction:

This instruction is for removal and installation of the new 122-8842 Wiring Harness for the IAPCV on these engines. This harness is intended for service replacement of the section of the 122-8835 Wiring Harness that serves only the IAPCV.

Installation:

Cat C7 Iap Valve Location

A. Remove The Failed Harness

1. Remove the section of failed harness:

2. Locate the IAPCV at the inboard rear and top of the high pressure hydraulic pump. The pump is mounted to the back of the front cover on the upper left side of the engine, as seen from the driver's seat, (illustration 1 and 2).

Iap

3. Gently pry open the 'ears' (illustration 4), that retain the 2-pin electrical connector in place, and unplug the harness from the 122-5053 IAPCV.

4. Remove the harness tie wraps from the IAPCV back to connector P2. There is one tie a few inches below the connector (illustration 1 and 2), and two more along the engine block toward the rear.


Illustration 1. High pressure hydraulic pump (1), 2-pin Packard Electrical Connector (2), tie wraps (3), 40-pin connector P2 (4), 40-pin connector J2 (5).


Illustration 2. Hydraulic pump (6), IAPCV (7), tie wrap (8), Fuel Transfer Pump Gp (9).

5. On early production engines the 122-8835 Wiring Harness is one piece. If so, cut the IAPCV Sensor Wires where they emerge from the braid at the sensor end. On later engines, the harness has four separate sections.

6. Remove the 40-pin connector P2 from J2 on the ECM by unscrewing the M5 Allen Head Screw from the rear of J2.

7. Using the 121-9588 Deutsch Pin Removal Tool (medium blue, for #16 and #18 gauge wires), remove the two pins from P2 (illustration 3). Insert wire removal tool without twisting.

Location

8. Remove the pink wire from P2 pin-19 and the black wire from P2 Pin-13. Cut these two wires where they emerge from the braid near P2.

B. Install New 122-8842 Wiring Harness:

Cat C7 Iap Valve Location


Illustration 3. P2 pin-13 (1), P2 pin-19 (2), P2 harness side of 40-pin connector (3), J2 ECM side of 40-pin connector (4), M5 Allen Head Screw (5).

1. Install harness in reverse order of removal. Begin by inserting the pink wire pin into P2 pin-19 and black wire pin into P2 pin-13. After inserting, use the 45 N (10 lb) pull test, to verify that the connection is secure.

2. Blend the two wires from the replacement harness in with all the other wires coming from P2 and install a tie wrap about three inches from P2.

Valve

3. Route the replacement IAPCV Harness along with the old harness (which still contains the two twisted pairs going to the Speed Timing Sensors) until forward of the second secured tie wrap. Be sure the wires are routed next to the block, between the block and the oil feed tube to the hydraulic oil pump.

4. Use tie wraps to bind the replacement harness to the old harness. Be sure new tie wraps are installed around both harnesses in the three locations that are secured to the block. Use as many additional unsecured tie wraps as necessary to bind the two harness sections tightly together. Do not attach tie wraps to individual wires. Attach only to braided sections of harness.

NOTICE

It is especially important to replace the tie wrap nearest the sensors, to prevent sensor failure caused by vibration of loose sensor wires.

Cat C7 Iap Valve Location Diagram


Illustration 4. Weatherpak Seal (6), 'ears' (7).

5. Be sure that the Weatherpak Seal is installed on the connector, and use care when inserting the connector into the IAPCV. Verify that the plastic 'ears' are snapped over the small projections to lock the connector in place (illustration 4).

Cat C7 Ipr Valve Location

6. Re-install P2 onto J2 and tighten the M5 Allen Head Screw from the rear of J2 to 2.25 ± 0.25 N·m (20 ± 2 lb in), (illustration 3).